1. Are installation details clear for:
a. Roof ridge?
b. Roof edge?
c. Roof water drainage?
d. Roof penetrations?
e. Expansion joints?
f. Flashing and counter-flashing?
g. Are attic ventilation details clear and workable?
2. Who provides roof blocking and curbs?
3. Does the roofing work need a pre-roofing conference?
4. What will be the sequence of roof installation?
a. Field measuring?
b. Shop drawings?
c. All rood deck installed or start with partial roof deck installed?
d. Resolve temporary and permanent piping for roof drains/downspouts.
e. Are responsibilities clear for tying into existing roofs? Cutting reglets, tear-off trash disposal, etc?
5. Which side does the moisture barrier face for the insulation?
6. Are insulation fastening methods clear?
7. Are caulking product, joint details and responsibilities clear?